The turnaround is no longer a physical black box.
AeroTurn 360 keeps a constant eye on every aircraft stand. It watches each turnaround step as it happens, catches TOBT (Target Off-Block Time) drift before it becomes a delay, works out the current critical path in real time, and tells ground teams exactly what to do next to get the aircraft back on schedule.
Runs on edge cameras that read the apron directly.
It tracks every service stream, fueling, baggage, cabin cleaning, catering, side by side on one live timeline, flags safety-zone breaches the moment they happen, and puts an AI copilot in the loop to talk teams through recovery. Ground services start on time, stands and gates get used more efficiently, and ramp safety rules get enforced automatically, not on paper.
Total Airport Management
A cross-domain Cognitive Hub bringing airside, terminal, landside and baggage into one live operating picture.
Explore TAM →AODB
A high-availability flight database with delay-cascade prediction, feeding the same TOBT and stand data AeroTurn 360 relies on.
Explore AODB →